Built to be installed with confidence.

Installer confidence is one of the biggest practical factors with any lightweight facade system. We support installers and project teams with a clear process, hands-on training and technical backup from setout through to the final clean.

The installation process

From setout to a finished brick facade.

01

Setout and system familiarisation

Every install starts with correct setout and an understanding of how the system goes together: material handling, storage and where the rail and facings land on the substrate.

02

Rail installation

The roll-formed steel rail is mechanically fixed to the substrate (top hats at maximum 600mm centres, 20mm cavity), forming the backbone the facings engage into.

03

Brick facing installation

Real clay brick facings are engaged onto the rail profile across flat walls, curves, soffits, corners and returns, following the project setout and bond pattern.

04

Pointing and finishing

Joints are finished with EasyPoint mortar, mixed with EasyLime and applied by mortar gun for a consistent, traditional brick appearance.

05

Cleaning and quality check

The facade is cleaned and checked against quality expectations, completing a result that reads as genuine brickwork because it is genuine brick.

Toolbox Training Academy

Installer training that removes the guesswork.

A good product can still struggle on site if installers are unsure how to set it out, handle it, fix it, point it, clean it or sequence it. The Toolbox Training Academy gives installers a practical pathway to become confident with the system before they deliver it under site pressure.

For builders and project teams, that means less installation uncertainty and a more predictable result.

What training covers
System familiarisation
Material handling and storage
Setout principles
Rail installation methodology
Brick facing installation
Sequencing and workflow
Pointing and finishing
Cleaning requirements
Common installation risks
Use of install kits and tools
Offsite prefabrication

Install in controlled conditions, not just on site.

Where a project suits it, facings can be pre-installed on light gauge steel, timber or cassette panels in factory conditions. Prefab helps where site access, working at height, labour, programme, repetition or weather make onsite work harder, and gives more control over quality and sequencing.

Technical support

You are not on your own.

We provide the technical manual, system data, fixing and substrate guidance, mortar and installation guidance, and project-specific support for builders, installers, engineers and facade consultants throughout delivery.

Final responsibility for structure, substrate design, fixing design, waterproofing, fire compliance, NCC compliance and project-specific engineering remains with the project design team. Modular Masonry Group supports this process by providing system information, product data, testing references, installation guidance and technical documentation.