Sunshine Hospital's new Mental Health Centre required 3,150m² of brick facade across a complex institutional building. Mid-project, a late-stage window redesign threatened to derail the facade programme — a scenario that would have caused significant delays with traditional masonry.
Nexbrick™'s prefabricated panel system absorbed the window redesign without schedule impact. Because panels are manufactured offsite against updated drawings, the change was incorporated into the factory programme without disrupting installation on site. 200+ vertical brick courses were executed to specification.
Sunshine Hospital's new Mental Health Centre required 3,150m² of brick facade across a complex institutional building. Mid-project, a late-stage window redesign threatened to derail the facade programme — a scenario that would have caused significant delays with traditional masonry.
Nexbrick™'s prefabricated panel system absorbed the window redesign without schedule impact. Because panels are manufactured offsite against updated drawings, the change was incorporated into the factory programme without disrupting installation on site. 200+ vertical brick courses were executed to specification.